Before Photo
Crawlspace Condition Before
Before Photo
Crawlspace before damp insulation falling
Before Photo
Fallen insulation, debris, and water stains at footing/slab intersection
Before Photo
Condition of damp insulation ans water stains on concrete
Before Photo
Condition of insulation, water stains, and rust on metal
Before Photo
Damp, falling insulation
Before Photo
Falling insulation, water stains and mold on wood post
Before Photo
Water on rat slab
Before photos
Debris, damp insulation, water stains
Before Photo
Damp insulation, debris, water stains
Before photo
Falling insulation, water intrusion at foundation vents
Before Photo
Infloor heat tubing in crawlspace Note water stain on pier
Before photo
Insulation and plumbing
Before photo
Debris and water stains
Before photo
Starting the cleanup
During photo
bagged insulation during cleanup process
During photo
Removing and bagging insulation
During photo
bagging and removing insulation
During
Technician installing Silver Glo Wall insulation
During
Installing Silver Glo wall insulation
During
Silver Glo wall panels
During
Installing Silver Glo wall panels Note mold on bottom of floor joist
During
Techs installing Silver Glo wall panels Note mold on bottom of floor joist
During
Installer applying foam adhesive for wall panels Note white mold caused by high humidity
During
Mechanically fastening wall panels
During
Mechanically fastening wall panels
During
Installing wall panels
During
Rolling out and installing drainage matting
During
Installing drainage matting around obstacles
During
installing drainage matting getting the overlap correct
During
Installing drainage matting in tight spaces
During
Silver Glo on wall drainage matting being installed
During
Silver Glo, drainage matting, and sump pump
During
Installing Terra Block over drainage matting
During
Installing Terra Block over drainage matting
During
Silver Glo, drainage matting and Terra Block
During
Taping Terra Block seams
During
Taping Terra Block Seams
During
Installer working on Terra Block seams
During
Installer working on seams
During
Installer working in corner on Terra Block
During
Installer mechanically fastening Terra Block to concrete footing
During
Installing fastener into concrete
During
Silver Glo, Drainage matting and Terra Block
During
Another view as work progresses before the CleanSpace liner is installed